The proposed scheme involves the demolition of the existing building, excavation of a basement and the construction of a new mixed residential and gallery space development comprising six above ground storeys and two below ground levels. The site is underlain by the Jubilee Line, the northbound tunnel of which passes underneath the adjacent property No. 26-28 Mount Row.


A key structural challenge is the acoustic attenuation requirements to mitigate the impact of ground borne noise and vibration from the tunnel. This is achieved by isolating the proposed basement using a “box in a box” principles. We have worked closely with the acoustic consultant to develop a bespoke attenuation solution to maximise the achievable basement area.